FAQ
Building Process of Prefab Homes in Peterborough
A: From design to move-in, most projects take 3–6 months — much faster than the 9–16 months typical of site-built homes.
A: We help you handle permits, drawings, and construction logistics. We also coordinate with local trades for site prep if needed.
A: Absolutely. We specialize in both rural and urban builds, and support off-grid upgrades when needed.
A: We support slab-on-grade, crawlspace, and full basement foundations, depending on your lot and budget.