By Sean Stevenson · Municipal figures verified
Custom home builders Aurora Ontario: My Own Cottage builds year-round custom homes on customer-owned lots in the Town of Aurora, with published prices. Preconfigured models start at $229,500 for the structure and delivery. Foundation, site preparation, servicing and turnkey finishing are quoted separately, and permits and municipal charges depend on your lot.
My Own Cottage Inc. is an HCRA-licensed, Tarion-enrolled prefab home and cottage builder based in Orillia, Ontario. We deliver anywhere in Ontario, and this page covers the Town of Aurora as part of our build-on-your-lot service across the province. An Aurora lot carries its own development charges, permit fees and, on Moraine land, a zoning step before the building permit. Each is set out below with the Town’s own figures.
| Year-round model | Floor area | Bedrooms / bathrooms | Preconfigured model starting at |
|---|---|---|---|
| Hudson | 1,550 sq ft | 3 / 2 | $524,500 |
| Algonquin | 2,125 sq ft | 4 / 2 | $629,500 |
| Titan | 2,971 sq ft | 3 / 3 | $799,500 |
| Victoria | 3,373 sq ft | 4 / 5 | $919,500 |
Each price covers the structure and delivery only. Compare every model in the full catalogue of preconfigured designs.
Bring your Aurora lot address, and your survey if you have one, to a free, no-obligation consultation.
An Aurora build with us suits someone who owns a lot, or has an accepted offer on one, and wants a year-round primary home. You start from a preconfigured model with a published price, and most of our clients customize it. My Own Cottage helps with municipal permits, and the site work is quoted against your lot before you sign.
Every build follows four stages: Design, Build, Deliver and Install. On an Aurora lot, the zoning and conservation authority steps sit inside the Design stage.
| Stage | What happens on an Aurora build |
|---|---|
| Design | You choose a preconfigured model and customize it. The lot’s zone, any minor variance and any conservation authority permit are settled before the building permit. |
| Build | Your home is built to the specification set in the agreement. |
| Deliver | The home is delivered to your Aurora lot. Delivery is inside the model price. |
| Install | Your home is installed on your lot. Licensed trades carry out the foundation, site preparation and servicing under separate quotes. |

Licensed trades do, working as our licensed-trade installation affiliates: contracted, not employees. They quote the foundation, site preparation and servicing against your Aurora lot, and that scope is set in the agreement before the build. A larger lot with room for delivery suits this approach best.
Wondering whether a delivery can reach your Aurora lot, and what its foundation, site preparation and servicing will cost? Send the address and your survey, and get that site work quoted against your lot.
If you already have an architect’s drawings and want a builder to tender and build them on site, a builder who builds on site is the usual fit. If you want a published starting price and the site scope in writing before you commit, compare us.
We don’t take on renovations, additions, landscaping or commercial work. This page covers building on a vacant or estate lot; if you plan to replace an existing house on an established street, raise it at your consultation. For a garden suite or another additional dwelling unit behind an existing Aurora home, start with the province’s rules on adding a second or third unit. Seasonal cottages and cabins belong in cottage country, and this page doesn’t cover them.
The model is the first number, and we publish it. Our preconfigured prefab homes start at $229,500 and run to $949,500, covering the structure and delivery to your lot. Pricing tracks specification rather than floor area, so two homes of similar size can sit far apart in price.
Price follows specification, not size, so compare the designs side by side: floor area, bedrooms and each preconfigured model’s starting price.
Six costs sit outside the model price on every lot. The site work is quoted against your lot before you sign. Permit fees and development charges are set by the Town, York Region and the school boards.
| Cost outside the model price | Who sets it on an Aurora lot |
|---|---|
| Foundation | Licensed-trade installation affiliate, quoted against your lot |
| Site preparation | Licensed-trade installation affiliate, quoted against your lot |
| Servicing (Town water and sewer connections, or a septic system) | Affiliate quote, plus Town of Aurora connection and water meter charges |
| Permits | Town of Aurora Building Division, plus a conservation authority permit where your lot is regulated |
| Municipal charges | Town of Aurora, York Region and school board development charges |
| Turnkey finishing | Quoted separately |

My Own Cottage doesn’t quote a price per square foot, because pricing tracks specification rather than floor area. Two of our models of near-identical size sit 1.7 times apart per square foot. On an Aurora lot, the development charges alone can exceed half the price of our compact models.
A development charge is a one-time fee a municipality charges on a new home. The Town of Aurora lists $134,953 per single or semi-detached home for July 1 to November 7, 2026. That total combines three separate charges set by three bodies.
| Development charge, per single or semi-detached home | Amount | Source | Rate effective |
|---|---|---|---|
| Town of Aurora | $41,301 | By-law 6592-24, as amended by 6614-24 and 6644-24 | July 1, 2026 |
| York Region | $84,718 | Region-wide By-law 2026-20 | May 21, 2026 |
| Education (York Region District School Board and York Catholic District School Board) | $8,934 | Listed by the Town of Aurora | July 1, 2026 |
| Total listed by the Town of Aurora | $134,953 | All three | July 1 to November 7, 2026 |
The Town states that “final DC rates are only calculated upon the review of the final construction building permit drawings.” York Region states that, generally, the amount of its charge is determined at building permit issuance, “with the payment occurring at occupancy.” The Town indexes its rates each January 1 and July 1, so confirm the rate in force on the date your permit is issued.
York Region lists water at $8,107 and wastewater at $28,967 inside its $84,718 single detached rate. Its by-law charges them where a lot is “serviced by regional water services” or wastewater services, and it counts a lot as serviced when the service is “connected to or available to be connected to” it. York Region publishes no separate rate for a lot on a private well and septic system. Ask the Town what applies to your lot before you budget.

Development charges are set by the Town, York Region and the school boards, not by any builder. What a builder can put in writing is everything else: the model price and the site work for your lot.
The Town of Aurora’s Building Division issues building permits for a new house in Aurora. Applications go to [email protected], and the Division’s number is 365-500-2081. The Town’s 2026 fees and charges by-law sets every fee below.
The Town charges $20.00 per square metre for a new single detached house, and that permit includes the building, plumbing, HVAC and occupancy permits. The Town measures floor area from the exterior face of the exterior walls, including an attached garage, basement and cellar. The rate is per square metre, not per square foot.
| Town of Aurora fee (By-law 6737-25, effective January 1, 2026) | Fee | Unit |
|---|---|---|
| Building permit, new single detached house | $20.00 | Per square metre of floor area |
| Minimum Part 9 residential permit fee | $342.00 | Per application |
| Security deposit under the Infill Housing Policy | $10,000.00 | Before a permit for a new dwelling is issued |
| Lot grading review and inspection | $352.00 | Per lot |
| New on-site sewage system, 200 m² or less | $687.00 | Per system |
| New on-site sewage system, greater than 200 m² | $5.00, to a maximum of $3,932.00 | Per square metre |
| New service connections built by the Town | Actual cost, plus 10% administration, plus HST | Each |
| Water meters | Actual cost, plus 35% overhead (capped at $513 per meter), plus HST | Each |
The Town of Aurora’s Building Division does. York Region Public Health states that “a permit issued by the Municipal Building Department is required for all new homes serviced by a private sewage system.” On a lot without Town sewer, the septic system is a separate budget line, with its own design and installation quote.
Aurora’s Private Tree Protection By-law 5850-16 lets an owner remove up to two trees over 20 cm in diameter in a 12-month period without a permit. The Town states that a building permit application needs a tree permit “only if the proposed development will cause the injury or removal of a tree that is regulated by the Tree Permit Bylaw.” Allow about 30 days from a complete tree permit application, so a wooded estate lot needs it in the schedule.

It can. The Town keeps a Register of Properties of Cultural Heritage Value or Interest, dated March 2025, which includes properties in the Northeast Old Aurora Heritage Conservation District. If your lot is on the register or in the district, speak to the Town’s heritage planning staff before you design.
A new Aurora house can need a building permit, a $10,000 security deposit, a septic permit and a tree permit before work starts. My Own Cottage helps with municipal permits. Bring your lot address and survey to a free consultation.
You can, but on an existing lot in three of Aurora’s Moraine zones, not by permit alone.
Aurora’s zoning by-law says a new single house on an existing lot in the Natural Core, Natural Linkage and Countryside Moraine zones “will only be permitted through a minor variance or rezoning.”
That zoning step comes before the building permit.
Comprehensive Zoning By-law 6000-17, consolidated to August 31, 2026, sets out Aurora’s Moraine zones, including EP-ORM (Environmental Protection), NC-ORM (Natural Core Area), NL-ORM (Natural Linkage Area) and C-ORM (Countryside Area). Sections 16.1.3, 17.1.3 and 18.1.3 carry the same rule for the NC-ORM, NL-ORM and C-ORM zones. Check your lot’s zone on the Town’s zoning schedule before you firm an offer.
Zoning By-law 6000-17 · Moraine zones
The zoning by-law ties the minor variance or rezoning to section 3.13.3 g of Official Plan Amendment 48. That section permits a single dwelling on the Moraine if two tests are met:
| Approval | Applies when | Who issues it and timing |
|---|---|---|
| Preliminary Zoning Review | On an existing lot in the Natural Core, Natural Linkage or Countryside Moraine zones | Town of Aurora; the Town aims to reply in writing within five business days |
| Minor variance or rezoning | The same lots; tied to section 3.13.3 g of Official Plan Amendment 48 | Town of Aurora; in place before the building permit application |
| Conservation authority permit | If LSRCA or TRCA regulates the lot | LSRCA or TRCA, under Ontario Regulation 41/24; TRCA sets the fee by application category |
| Tree permit | If the proposed development will cause the injury or removal of a regulated tree | Town of Aurora, Private Tree Protection By-law 5850-16; allow about 30 days from a complete application |
| Building permit | Every new house | Town of Aurora Building Division; the Ontario Building Code sets a 10-day timeframe for a complete application for a house |

Start with a Preliminary Zoning Review. The Town requires its result as part of a complete minor variance application, and aims to reply in writing within five business days. Budget the study, the application and the review time before you commit to a design.
Holding or buying a lot in an Aurora Moraine zone? Bring the zone, the survey and any studies you already have before you commit to a design.
It depends on the watershed your lot drains to. Two conservation authorities work in Aurora: the Lake Simcoe Region Conservation Authority (LSRCA) and the Toronto and Region Conservation Authority (TRCA). Both regulate under Ontario Regulation 41/24, in effect since April 1, 2024.
LSRCA lists the Town of Aurora among its partner municipalities in the Lake Simcoe watershed. In an area LSRCA regulates, “the construction, reconstruction, erection or placing of a building or structure of any kind” may need its approval. LSRCA’s Interactive Regulation Mapviewer shows whether a property is in a regulated area.
TRCA lists the Town of Aurora as a partner in its Humber River watershed plan. TRCA states that building a new home “is considered DEVELOPMENT ACTIVITY” and needs a permit “if the project is proposed within a TRCA Regulated Area unless provincial exemption criteria apply.” A TRCA planner sets the fee by application category.
They may. Bill 97 received Royal Assent on April 24, 2026, and it consolidates Ontario’s 36 conservation authorities into 9 regional authorities from February 1, 2027, or a later date set by regulation. Under the Bill, LSRCA is amalgamated into the Lake Huron Regional Conservation Authority and TRCA into the Central Lake Ontario Regional Conservation Authority. Confirm the permitting body for your lot at the time you apply.
Check the licence first. The Ontario Builder Directory is HCRA’s official source of information on Ontario builders and vendors, and you can search it by builder name. The Home Construction Regulatory Authority (HCRA) runs it, and builder licensing moved there from Tarion on February 1, 2021.
Search “My Own Cottage” in the Ontario Builder Directory to see our HCRA licence and Tarion enrolment in one place. My Own Cottage Inc. is an HCRA-licensed, Tarion-enrolled prefab home and cottage builder based in Orillia, Ontario. Run the same search on every builder on your Aurora shortlist.
No page can tell you which builder is best for your lot. Compare what each builder publishes and puts in writing:
For each stage from lot purchase to occupancy, see our lot-to-occupancy build sequence.
Comparing Aurora builders? Put our model price and site-work quote in writing beside theirs.
| What we checked | Primary source | Date checked |
|---|---|---|
| Aurora development charges, by-law, total and dates | Town of Aurora, Development Charges and Development Charges Pamphlet, July 1, 2026 | September 28, 2026 |
| York Region development charge, water and wastewater lines, and timing | York Region, Development Charges, By-law 2026-20 and Development Charges Pamphlet, May 21, 2026 | September 28, 2026 |
| Permit, septic, deposit, lot grading, connection and water meter fees; floor area rule | Town of Aurora, By-law 6737-25, Schedule G, Schedule B and Schedule E | September 28, 2026 |
| Building Division contacts | Town of Aurora, Building Permits | September 28, 2026 |
| Septic permits for new homes | York Region Public Health, Sewage Backup Factsheet | September 28, 2026 |
| Building permit decision timeframe for a house | Ontario, Citizen’s Guide to Land Use Planning: Building Permits | September 28, 2026 |
| Private Tree Protection By-law 5850-16 | Town of Aurora, Trees and By-law 5850-16 | September 28, 2026 |
| Heritage register and conservation district | Town of Aurora, Register of Properties of Cultural Heritage Value or Interest, March 2025 | September 28, 2026 |
| Zoning By-law 6000-17, its consolidation date and Moraine zones | Town of Aurora, Zoning and Zoning By-law 6000-17, Sections 14 to 19 | September 28, 2026 |
| Official Plan Amendment 48, section 3.13.3 g | Town of Aurora, OPA 48 | September 28, 2026 |
| Moraine lands within the Greenbelt Plan | Ontario, Oak Ridges Moraine Conservation Plan | September 28, 2026 |
| Preliminary Zoning Review | Town of Aurora, Application for Preliminary Zoning Review | September 28, 2026 |
| LSRCA partner municipalities and permit requirement | LSRCA, Our Partners and Do I Need a Permit? | September 28, 2026 |
| TRCA watershed partners and new-home permit | TRCA, Humber River Watershed Plan and Building a New Home | September 28, 2026 |
| Conservation authority consolidation under Bill 97 | Legislative Assembly of Ontario, Bill 97, Royal Assent | September 28, 2026 |
| Second and third units on a residential lot | Ontario, Citizen’s Guide to Land Use Planning: Zoning By-laws | September 28, 2026 |
| Builder licence lookup and the 2021 move from Tarion | Ontario Builder Directory and HCRA, launch news release, February 1, 2021 | September 28, 2026 |
| Model sizes, bedrooms, starting prices and the per-square-foot comparison | My Own Cottage, live catalogue | September 28, 2026 |
Yes. Aurora’s Zoning By-law 6000-17 applies Oak Ridges Moraine Conservation Plan zones to parts of the Town, and Ontario states that “the lands to which the Oak Ridges Moraine Conservation Plan and the Niagara Escarpment Plan apply are also subject to the Greenbelt Plan.” A Moraine lot in Aurora is therefore inside Ontario’s Greenbelt Area.
The Ontario Building Code sets a 10-day timeframe for a complete permit application for a house, and within it the municipality “must either issue the permit, or refuse it and provide all reasons for refusal.” The Town of Aurora aims to answer a Preliminary Zoning Review in writing within five business days, and a tree permit needs about 30 days from a complete application. On a Moraine lot, a minor variance or rezoning, plus any conservation authority permit, adds its own review time before the building permit.
An Aurora lot review should start with the zone, because a Natural Core, Natural Linkage or Countryside Moraine zone adds a minor variance or rezoning. Next, check whether LSRCA or TRCA regulates the lot, and whether it has Town water and sewer or needs a septic system. Last, check for trees regulated by By-law 5850-16 and for a listing on the Town’s heritage register.
Yes. Turnkey is one of the fulfilment options in the My Own Cottage catalogue, alongside kit and panelized. Turnkey finishing is quoted separately from the model price, as are the foundation, site preparation and servicing on your Aurora lot. Permits and municipal charges depend on the lot.

Book a free consultation below, and bring your lot’s address, its zone and your survey if you have one. At a free consultation, we go through the model price, the site work to be quoted against your lot, and the Aurora permits and charges it will need. Then compare our written scope with any of the custom home builders Aurora Ontario lot owners shortlist.
Our facility: 12 Lankin Blvd #3, Orillia, ON L3V 7B6 · 1 (705) 345-9337 · [email protected]
About the author
Sean Stevenson is Chief Marketing Officer and Buyer Experience Lead at My Own Cottage Inc., an HCRA-licensed, Tarion-enrolled prefab home and cottage builder based in Orillia, Ontario.
For five years, Sean has worked alongside the company's build team, guiding Ontario buyers from lot assessment and budgeting beyond the model price through zoning, permits, development charges and final occupancy. Sean focuses on the part most buyers underestimate: what a prefab home costs to complete once the foundation, servicing and approvals are added to the model price.
Connect with Sean on LinkedIn · View My Own Cottage's HCRA licence in the Ontario Builder Directory