Cottage Builders in Parry Sound

Last updated: August 26, 2026

Cottage builders in Parry Sound serve a district, not just a town.

Most cottage lots sit in the surrounding municipalities — Seguin, Carling, McDougall, The Archipelago, McKellar, Whitestone and Magnetawan — and each sets its own zoning by-law and issues its own building permits.

Which township your lot sits in moves more of your budget than which builder you choose.

✓ Ontario-Built | ✓ HCRA Licensed | ✓ Tarion Enrolled | ✓ Delivered & Installed

My Own Cottage is a custom home builder and prefab supplier based in Orillia, and one of the cottage builders in Ontario that property owners can compare across the province. We design and build cottages, cottage cabins and year-round homes in a controlled factory environment, then handle delivery coordination and on-site installation on your lot.

This page covers what a factory-built cottage costs here, which approvals apply to a Parry Sound area property, what water access does to your financing, and the checks worth running before anyone quotes a price. Start with the models, then work down through the lot.

KEY TAKEAWAYS
1.

Your municipality, not the Town, sets your costs. Most Parry Sound cottage lots sit in surrounding municipalities that each set their own zoning by-law and issue their own building permits. The Town of Parry Sound’s development charge is $7,495 per single detached dwelling; whether your municipality levies one at all depends on where you build.

2.

Budget for three things, not one. Builder quotes cover the structure. The lot — foundation, septic, water, hydro, access — and the municipality’s charges are separate. Prefab cottages start at $229,500 delivered and installed, with everything below the building quoted against your site.

3.

Your septic permit doesn’t come from your township. For most of Parry Sound District, the North Bay-Mattawa Conservation Authority administers on-site sewage systems under Section 8 of the Ontario Building Code. The Township of The Archipelago is excluded.

4.

Seasonal or four-season decides your warranty. A cottage built to Ontario Building Code year-round standards is licensed and warranty-covered; one that isn’t carries neither. Access by boat doesn’t change that — how it was built does. The same decision affects CMHC financing eligibility.

Cottage Models for Parry Sound Lots

My Own Cottage offers preconfigured prefab cottages and modular homes from 505 to 3,373 square feet, starting at $229,500.

Every price below covers the cottage built to specification, delivered and installed on a prepared site. Foundation, site preparation, servicing, permits and municipal charges are separate and quoted against your property.

Preconfigured model starting at: $229,500
Preconfigured model starting at: $229,500
Preconfigured model starting at: $229,500
Preconfigured model starting at: $299,500
Preconfigured model starting at: $284,500
Preconfigured model starting at: $279,500
Preconfigured model starting at: $324,500
Preconfigured model starting at: $289,500
Preconfigured model starting at: $339,500
Preconfigured model starting at: $369,500
Preconfigured model starting at: $409,500
Preconfigured model starting at: $419,500
Preconfigured model starting at: $529,500
Preconfigured model starting at: $519,500
Preconfigured model starting at: $524,500

Pricing tracks specification, not floor area alone — two models of similar size can differ by a hundred thousand dollars depending on the building envelope, finishes and mechanical package.

Any model can be adapted, and we produce custom cottages where none of the preconfigured designs suit the lot. We build new cottages and homes rather than renovations or cottage additions.

What a My Own Cottage Package Includes

A My Own Cottage home package covers the cottage built to your specification in our Orillia factory, transported to your property and installed on a prepared foundation. Delivery and setup are inside the price. Everything below the building is not.

Inside the model priceQuoted against your lot
Cottage built to specificationFoundation and site preparation
Factory quality controlSeptic system and water supply
Transport to your propertyHydro connection or off-grid power
Crane set and on-site installationDriveway, access and grading
Licensed trades for the setBuilding permits and municipal charges

The installed figure is confirmed after a site visit, because access and ground conditions affect what the set takes. Ask any builder for the same split in writing — a package price that does not say what sits outside it is not a price you can compare.

Your Lot Is Probably Not in the Town of Parry Sound

The Town of Parry Sound is a municipality of under 7,000 people, and most of its land is already built on. The waterfront property and inland lots people mean when they search “Parry Sound” sit in the surrounding municipalities of Parry Sound District — some townships, some municipalities, each with its own building department, zoning by-law and permit fee schedule.

There is no county or regional government above them, and no single rulebook.

Practically:

• Your building permits come from the municipality your lot sits in, not the Town.

• Development charges are set municipality by municipality. Some levy them, some do not, and the amounts differ substantially where they do.

• Your zoning — setbacks, lot coverage, shoreline provisions, minimum floor area — comes from that municipality.

• Severance authority differs too. Most of the area goes through the Parry Sound Area Planning Board, but Magnetawan has held its own Planning Act authority since September 2024.

• A “Parry Sound” service page may describe a process that does not match your municipality at all.

Cottage builders Parry Sound municipality diagram showing the Town of Parry Sound and seven surrounding municipalities that control their own zoning and building permits.

Your lot may be in the Parry Sound area without actually being governed by the Town of Parry Sound. The surrounding municipalities each set their own zoning rules and issue their own building permits, so the exact location of your property determines which rules apply.

To confirm which municipality you are in, check the roll number on your tax bill or the municipality named on your survey, then contact that township’s building department directly. Two worked examples of how far this varies:

The Town of Parry Sound levies a development charge of $7,495 on a single or semi-detached dwelling, under by-laws 2023-7346 through 2023-7351, in effect since June 6, 2023. Charges are calculated before the building permit is issued, and a pre-consultation by-law means planning applications begin with a staff meeting and a site plan sketch.

The Township of Seguin levies development charges under By-law 2024-080, payable at building permit issuance at the rate in effect when payment is due, with permit fees set separately under Schedule A of By-law 2026-033.

Not every municipality in the district has a development charge by-law — confirm with yours rather than assuming. Seguin also requires that a vacant lot have an approved entrance and an assigned civic address before you can apply for a building permit, and asks for a Cottage Declaration with the application.

Two neighbouring municipalities. Different charges, different timing, different pre-conditions. The same holds across cottage country. Wasaga Beach’s charges and shoreline rules, for instance, look nothing like Parry Sound’s.

Verify before you budget. These by-laws are updated and indexed regularly. Treat the figures as a starting point and confirm with your municipality.

What It Costs to Build a Cottage in the Parry Sound Area

A cottage project here has three separate budgets: the structure, the lot, and the municipality. Most quotes cover only the first. A prefab cottage from My Own Cottage starts at $229,500 delivered and installed, but foundation, septic, well, hydro, road access, building permits and development charges are additional and depend entirely on the property.

Cottage builders Parry Sound cost breakdown showing cottage pricing, foundation and site preparation, servicing, permits and municipal charges.

A Parry Sound cottage project is easier to budget when you separate the costs into three buckets: the cottage itself, the lot and servicing, and municipal permits and charges.

1. The structure. The cottage built in the factory, delivered and set on a prepared foundation. The number most builders quote, and the only one broadly predictable in advance.

2. The lot. Foundation, site preparation, driveway or access improvement, septic, well or water supply, hydro or off-grid power, and grading. On rock, on a slope, or at the end of a long private driveway these move substantially, and nobody can price them from a photograph. 

3. The municipality. Development charges, permit fees, septic permit fees, occupancy permit, entrance permit, and any planning application your proposal triggers.

Foundation type is usually the largest single variable here — how foundations are chosen on rock and slope covers the options and what drives the decision.

About the per-square-foot figures circulating online

You will find ranges quoted for cottage construction in this area, commonly in AI summaries and forum threads. Those figures are unsourced, usually drawn from site-built custom construction, and rarely state what they include.

Before using any of them, ask whether the number covers the foundation, septic and water supply, driveway and hydro, and building permits and development charges — and whether it describes a seasonal build or one built to year-round standards.

For the province-wide picture, our guide to what cottage construction costs across Ontario breaks the same components down without the regional specifics.

What factory construction changes, and what it does not

Controlled factory construction gives you cost predictability on the structure. The building is assembled indoors, so weather-related delays and material waste during fabrication are reduced and quality control is repeatable across builds.

Site preparation proceeds in parallel with factory work rather than after it. Because the envelope is assembled under controlled conditions, energy efficiency is easier to build in consistently than on an exposed site in November.

What it does not do is make your lot cheaper. Septic, well, hydro, rock excavation and access are the same work regardless of how the cottage above them is built. Any claim that prefab saves 20 to 50 percent on a project is quoting the structure and ignoring the two budgets underneath it.

Every municipality prices your build differently

The Town of Parry Sound charges $7,495 in development charges. Some neighbouring municipalities don’t levy them at all. Which one your lot sits in decides more of your budget than the model you pick.

Free · No obligation · We’ll need your lot location and rough size

Who Approves What: Permits, Septic and Shoreline

On a Parry Sound District property you will usually deal with more than one approval authority. Your building permits come from your township. Your septic permit does not.

Building permits

Issued by the municipality your lot sits in, with requirements, fees and portals that vary. Seguin’s building department uses Cloudpermit and requires an occupancy permit before you move in; occupying without one contravenes the Building Code Act. In the Town of Parry Sound, a detached accessory structure of 10 square metres (108 square feet) or less with no plumbing generally does not require a building permit — a Town-specific threshold, so do not assume it applies in a township.

Your septic permit

This one surprises almost everyone. The North Bay-Mattawa Conservation Authority (NBMCA) delivers the on-site sewage system program across the Districts of Nipissing and Parry Sound, excluding the Township of The Archipelago, as the delivery agent appointed under Section 8 of the Ontario Building Code.

NBMCA Parry Sound On-site Sewage System Office
90 Bowes St., Suite 202, Parry Sound · 705-746-7566

If your lot is in The Archipelago, confirm the septic route with the Township directly.

Shoreline and conservation authority approvals

Whether a conservation authority regulates your shoreline depends on where the property sits. NBMCA’s regulatory jurisdiction under the Conservation Authorities Act covers the Lake Nipissing and Ottawa River basins — a different area from its septic program — so confirm with your municipality and with the authority whose watershed your lot drains to.

Ontario’s conservation authorities are also being amalgamated into regional authorities on a transition date of February 1, 2027 or such later date as may be prescribed, so confirm jurisdiction when you apply rather than relying on a name given earlier.

Approvals interlock. A septic design affects your permit application, and an entrance permit and civic address may be required before you can apply at all. Pre-consultation, where offered, is the cheapest hour you will spend on the project.

Seasonal or Four-Season: The Decision That Changes Your Warranty

This decision determines whether you have consumer protection at all. Under Ontario’s new home legislation, a cottage built for year-round occupancy is a “home”: the builder must be licensed and the build is enrolled for statutory warranty.

A cottage that does not meet Ontario Building Code requirements for year-round occupancy is a seasonal home — builder licensing is not required, and it carries no statutory warranty.

Cottage builders Parry Sound comparison of seasonal and four-season cottages, showing differences in HCRA licensing, Tarion statutory warranty coverage and CMHC Prefab Plus conditions.

Seasonal and four-season cottages can look similar, but how they’re built can affect builder licensing, statutory warranty coverage and whether the property can meet CMHC Prefab Plus requirements.

The Home Construction Regulatory Authority is explicit about how this is judged. Three points matter before you sign, and all three come from the HCRA’s definition of a “home”.

1. How you plan to use it is not the test.
A seasonal home is one not constructed for year-round occupancy — for example, with no insulation or provision for winter heat. Intending to use it only in July does not change the answer.

2. Access by boat does not disqualify a cottage.
The HCRA states that the means of access to the property, such as by boat, and intended use as a principal versus secondary residence, are not relevant considerations. An island cottage on Georgian Bay, built to year-round Building Code standards, is a home for licensing and warranty purposes.

3. Zoning is not the test either.
It is the physical characteristics of the cottage, not the legality of occupying it year-round under a zoning by-law, that decide warranty eligibility.

What “built for year-round occupancy” actually means

The practical indicators are the elements needed for an occupancy permit:

• Provision for heating

• Insulation

• Electricity, on-grid or off-grid

• Potable water supply

• Plumbing or means of waste disposal

• Sleeping and cooking areas

Two things to confirm in writing

Who builds the foundation. For modular homes, statutory warranty coverage applies where the vendor is responsible for constructing the foundation and affixing the home to it. If a third party pours yours, the warranty position changes.

Whether you are buying a kit or a build. Where a panelized or kit home is assembled and finished under the owner’s control, it is not a “home” for licensing and warranty purposes, because no single builder supplied all the work and materials. Kits suit some buyers well, but they are a different product with a different risk profile.

Want the scope in writing before you compare prices?
Cottage builders Parry Sound site access checklist showing bridge and road limits, overhead utility lines, driveway turn-in, module staging area and crane setup.

Before delivery day, we confirm the full route to your Parry Sound lot — including road and bridge limits, overhead utilities, driveway access, module staging space and safe crane setup.

A module arrives on a truck and is set with a crane. That needs a driveway entrance the truck can turn into, adequate width and overhead clearance, stable level ground for crane outriggers within reach of the foundation, staging space, and route clearance for bridge and road load limits including spring half-loads.

Delivery is checkable in advance, and it is the most common reason a delivery date moves.

Water-access and island lots

Georgian Bay’s eastern shore holds a great many water-access-only properties. Whether a specific model reaches a specific water-access lot depends on module dimensions, barge access and the shoreline at the landing point — a property-by-property answer, so ask before settling on a model.

What access does to your financing

Here is the connection almost nobody makes. CMHC’s Prefab Plus product sets conditions on the property, not just the buyer, and two of them rule out a large share of Parry Sound area lots.

Two conditions must both be met:

• Full-time, year-round occupancy — the property must be suitable and available for it

• Year-round vehicular access — including for homes located on an island, where bridge or ferry access counts

What that means in practice:

Your situationPrefab Plus
Seasonal cottageDoes not meet the occupancy condition
Water-access lot with no year-round vehicular routeDoes not meet the access condition
Four-season build with year-round road accessCan meet both conditions — other CMHC requirements also apply

One more distinction worth knowing. Where the home is permanently affixed to a permanent foundation, it is underwritten conventionally. Where it is not, it falls to chattel financing — a different product on different terms.

Decide seasonal or year-round, and confirm access, before building a financing plan around a program you may not qualify for. Prefab Plus is one route among several — financing a build outside a serviced town covers how lenders treat rural and recreational properties more broadly.

How Long a Parry Sound Cottage Build Takes

Nobody can honestly give a single number, and be wary of anyone who does. The timeline splits into two parts that behave differently.

Design and approvals vary by municipality and by what your proposal triggers. A straightforward build on a serviced lot moves faster than a shoreline build needing conservation authority clearance, a septic design and a minor variance. This phase is largely outside any builder’s control.

Construction is where factory building changes the arithmetic: your cottage is built indoors while foundation, septic and access work happens on site, rather than one after the other. That compresses the schedule against a strictly sequential build, but does not shorten the approvals phase in front of it.

Ask any builder for a timeline split into those two parts.

How to Compare Cottage Builders Parry Sound Buyers Actually Shortlist

Comparing two quotes usually means comparing two different scopes. Before choosing between cottage builders in Parry Sound — or between a cottage specialist and a custom home builder Parry Sound owners use for year-round construction — establish what each quote contains, because “design and build,” “turnkey” and “package” mean different things to different companies.

TypeWhat they doWhat the quote usually covers
Full-service local design and buildDesign, permits, construction, site work in-houseStructure and site work; lot separate
Regional design-buildCustom cottages and homes across several districtsStructure and finishes; pricing often unpublished
Specialty contractorStructural work, ICF construction, timber framing, docks, water-access workScope-specific; you coordinate the rest
Material package supplierCottage design and materials; you hire the builderMaterials only; labour excluded
Prefab supplier of factory-built homesFactory construction, delivery coordination, on-site installationStructure, delivery and setup; foundation, servicing and permits separate

Four questions that make any two quotes comparable:

1. What is excluded? Ask for the exclusions list in writing, not the inclusions list.

2. Who pulls the permits, and who pays the charges? Development charges frequently sit outside the contract.

3. Who is responsible for site preparation and the foundation? This affects your budget and your warranty.

4. What warranty applies, and on what condition? Seasonal builds and owner-assembled kits carry no statutory warranty.

Ontario maintains one public directory for the licensing check. The Ontario Builder Directory shows licensing status, years of activity, homes built, and any regulatory actions. Tarion no longer maintains a separate builder registry; that function moved to the HCRA in 2021. One directory, not two.

Check every builder you are considering, including us. My Own Cottage is HCRA-licensed and Tarion-enrolled, and builds to the Ontario Building Code. Licensing and enrolment do not remove the need for property review, municipal approvals or a detailed written contract — they establish an accountable foundation for the work.

How a My Own Cottage Project Runs

Four coordinated stages, so that cottage design, project management, delivery coordination and installation run through one team rather than several you coordinate yourself.

Custom waterfront cottage built by cottage builders in Parry Sound on Georgian Bay

Stage four, completed: a four-season build delivered and installed on a prepared site. Everything below the cottage is quoted against your own lot.

StageWhat happens
1. Consultation and lot reviewProperty location, road or water access, intended use, size and features. Where terrain, servicing or installation conditions need closer review, an on-site consultation is recommended.
2. Select and customizeReview the models that suit the lot and adapt layout, finishes and options — or start a custom design.
3. Site and municipal coordinationIdentify the site preparation, foundation, entrance, servicing and permit work required before installation. We support municipal coordination; approval requirements, fees and review periods remain with the municipality.
4. Build, deliver, installComponents are built in our Orillia factory while eligible site preparation proceeds in parallel. Delivery and on-site installation are coordinated with licensed trades according to access, site readiness and inspections.

One term you will encounter: CSA A277 is a certification procedure for factory-built construction, covering a manufacturer’s quality programme for work completed in the plant. It does not cover transport or on-site erection, which remain subject to municipal inspection like any other build.

The same four stages apply wherever we deliver — our overview of factory-built cottages across Ontario covers the process without the Parry Sound specifics.

Cottage Builders Parry Sound: Frequently Asked Questions

How do I choose a cottage builder in Parry Sound?

Compare on scope, not on price. Ask each builder what their quote excludes, who pulls the building permits and pays the development charges, who is responsible for site preparation and the foundation, and what warranty applies and on what condition. Then verify licensing in the Ontario Builder Directory, which shows licensing status, years of activity, homes built and any regulatory actions. Two quotes that look far apart are usually two different scopes rather than two different prices.

How much does it cost to build a cottage in the Parry Sound area?

Total cost has three components: the cottage, the lot work, and municipal charges. A prefab cottage starts at $229,500 delivered and installed. Foundation, septic, water supply, hydro, access and grading depend on the property, and development charges vary by municipality — the Town of Parry Sound’s charge alone is $7,495 for a single detached dwelling. Per-square-foot figures circulating online rarely state which of the three they cover.

How much does a three-bedroom cottage cost in Parry Sound?

My Own Cottage’s three-bedroom models start at $369,500 for Eagle’s Nest at 1,170 square feet and $379,500 for Harbour Side at 1,269 square feet with two bathrooms, each delivered and installed on a prepared site. Foundation, septic, water supply, hydro, access, building permits and development charges are quoted separately against your lot.

What is the typical cost of a prefab cottage in Ontario?

My Own Cottage’s 33 models range from $229,500 for a 505 square foot compact cottage to $949,500 at the top of the range, each covering the cottage built to specification, delivered and installed on a prepared site. Foundation, servicing, permits and municipal charges are quoted separately once the lot has been reviewed.

How long does it take to build a cottage in Parry Sound?

The timeline splits into two parts that behave differently. Design and approvals vary by municipality and by what your proposal triggers — a shoreline build needing conservation authority clearance and a septic design takes longer than a straightforward lot. Construction is compressed, because the cottage is built in the factory while foundation, septic and access work proceed on site in parallel rather than after it. Ask any builder for both parts separately rather than one blended number.

What permits are required to build a cottage in the Parry Sound area?

You will usually deal with more than one authority. Building permits come from the municipality in which the property is located, and each municipality sets its own fees and process. For most of Parry Sound District, the North Bay-Mattawa Conservation Authority administers on-site sewage-system permits under Part 8 of the Ontario Building Code, with the Township of The Archipelago excluded from that jurisdiction. Shoreline or natural-hazard work may also require conservation authority review or approval depending on the property.

What financing is available for a cottage build near Parry Sound?

CMHC Prefab Plus can finance eligible owner-occupied prefab homes with up to 95% loan-to-value and up to four construction advances. Minimum equity is 5% of the first $500,000 of lending value and 10% of the remainder.

The property must support full-time, year-round occupancy and year-round vehicular access. Seasonal-use cottages do not qualify. Homes permanently affixed to a permanent foundation are financed as real property; movable homes may require chattel financing.

Can a prefab cottage be used year-round?

Yes, where design, insulation, mechanical systems, foundation, servicing and approvals meet Ontario Building Code requirements for year-round occupancy. Decide early: it affects design, servicing, building permits, financing eligibility and statutory warranty coverage.

Can you build a cottage on a water-access or island lot?

Legally, yes — access by boat does not disqualify a cottage from builder licensing or statutory warranty coverage, provided it is built to year-round Building Code standards. Practically, whether a specific model reaches a specific lot depends on module size, barge access and the shoreline at the landing point.

Do kit cottages come with the same warranty?

Not necessarily. Where a panelized or kit home is assembled and finished under the owner’s control, it does not meet the definition of a “home” for licensing and warranty purposes, because no single builder supplied all the work and materials. Confirm in writing which product you are buying before comparing prices.

Do you build custom homes as well as cottages?

Yes. As a custom home builder we produce year-round modular homes and larger luxury cottages alongside compact designs, and offer custom cottage design where none of the models fits the lot. We also handle adding a second unit on a serviced lot — additional dwelling units and garden suites, where a municipality permits them — though a standalone cottage on its own recreational parcel is not an ADU.

Are prefab cottages more environmentally efficient to build?

Factory construction reduces material waste during fabrication compared with cutting on site, and assembling the building envelope under controlled conditions makes consistent energy efficiency easier to achieve than on an exposed site. Specific ratings and certifications vary by model — ask which apply to the one you are considering.

Is Parry Sound cottage country?

Yes. Parry Sound District, alongside Muskoka and Haliburton, is part of Ontario’s cottage country, covering the eastern Georgian Bay shoreline and a large inland lake system. The Town of Parry Sound is the district seat, but most cottage properties sit in the surrounding townships rather than inside the Town’s boundaries.

Talk Through Your Lot with Cottage Builders in Parry Sound

The fastest route to a real number is a conversation about the property, not the model. Tell us the municipality, the access type, whether you want seasonal or year-round, and roughly what size you have in mind.

Among cottage builders Parry Sound property owners shortlist, we are the factory-built option: the structure price is published, and the lot work is quoted against what your site actually needs.

Request a free cottage consultation.

Useful to have ready: property location or roll number, photographs, survey information, and a short list of what matters most.

MY OWN COTTAGE

Contact Us

We usually respond within 24 hours!

DIRECT ENQUIRIES

How We Verified These Figures

Every figure and rule on this page comes from a primary source. Municipal by-laws and program terms change, so each row is dated — confirm current requirements for your own property before you budget.

What we stateSourceChecked
Town of Parry Sound development charge, $7,495 per single or semi-detached dwellingTown of Parry Sound, by-laws 2023-7346 to 2023-7351 (in effect June 6, 2023)Aug 2026
Seguin development charges and permit feesTownship of Seguin, By-law 2024-080 and By-law 2026-033 Schedule AAug 2026
Septic permits administered by NBMCA across Parry Sound District, excluding The ArchipelagoNorth Bay-Mattawa Conservation Authority, Areas of JurisdictionAug 2026
Seasonal vs. year-round licensing and warranty, including boat accessHome Construction Regulatory Authority, Advisory 3 — Common Definition of “Home”Aug 2026
Builder licensing lookupOntario Builder Directory, obd.hcraontario.caAug 2026
Prefab Plus occupancy and access conditionsCanada Mortgage and Housing CorporationAug 2026
Conservation authority amalgamation, transition Feb 1 2027 or such later date as prescribedConservation Authorities Act, Part I.1Aug 2026
Model sizes and starting pricesMy Own Cottage 2026 model libraryAug 2026

Development charges and permit fees are indexed and updated on municipal schedules, and the Town of Parry Sound figure above is drawn from the by-laws as passed in 2023. Confirm the current rate with the municipality your lot sits in.

About the Author

Sean Stevenson, Chief Marketing Officer at My Own Cottage, an Ontario prefab home builder based in Orillia specializing in small prefab homes and modular cottages.

Written by Sean Stevenson, Chief Marketing Officer and Buyer Experience Lead at My Own Cottage Inc., an HCRA-licensed, Tarion-enrolled prefab home builder based in Orillia, Ontario.

For five years, Sean has guided Ontario buyers through the full prefab cottage process alongside the company’s build team — from lot assessment and all-in budgeting to zoning, permits, development charges and final occupancy. He focuses on the part most buyers underestimate: what a factory-built cottage actually costs once the foundation, servicing and approvals are accounted for.