Prefab Houses in Toronto: Prices, Garden Suites and Permits (2026)

My Own Cottage designs and builds prefab and modular homes for Toronto lots, from a 505 sq ft garden suite to a 3,373 sq ft family home.

Our designs start at $229,500.

  • HCRA-licensed
  • Tarion-enrolled
  • Canadian-built

A new house in Toronto also carries charges that have nothing to do with how it’s built:

  • a City development charge of $137,846;
  • a school board charge of $3,893;
  • building permit fees;
  • the foundation and servicing for your lot.

A garden suite built as a second unit on your lot pays no City development charge.

We’re HCRA-licensed and Tarion-enrolled, and based in Orillia.

Quick answers

Quick answers about prefab houses in Toronto
QuestionShort answer
What does a prefab house cost in Toronto?Our homes start at $229,500. Lot costs come on top, and the City development charge alone is $137,846 for a new house.
Can I put a prefab garden suite in my backyard?Usually, yes. Garden suites are allowed in Toronto’s residential zones: up to 120 m² over two storeys, or 60 m² on one storey.
Do I pay development charges on a garden suite?Not the City’s, when it’s your second unit.
How does the home get onto a Toronto lot?By crane, usually from the street. That needs a City Street Occupation Permit, which takes about 12 weeks to process.
Is it covered by Tarion?Yes. A home we build on your land is a Tarion “contract home”.

Tell us about your lot and we’ll tell you what fits.

What you can build on a Toronto lot

Toronto now allows far more on an ordinary residential lot than it did five years ago. Before choosing a design, it helps to know which of these you’re doing:

  • A new detached house.

    You either replace an existing house or build on a vacant lot. This is the most common prefab project in the city.

  • A garden suite.

    A separate small home in the backyard of an existing house. Approved city-wide in February 2022.

  • A laneway suite.

    Like a garden suite, but on a lot that backs onto a public lane. Approved city-wide in July 2019.

More units. Ontario’s Planning Act stops zoning from banning up to three units on urban residential land. That means two or three in the house, or two in the house plus one in a backyard building. Toronto goes further: four-unit multiplexes are allowed across the city. Since 2025, up to six units are allowed in Toronto and East York District and in Ward 23 (Scarborough North).

Our catalogue covers detached homes and backyard suites. A lot can have a garden suite or a laneway suite, not both.

What you can build on a Toronto lot in 2026: a detached house, garden suite, laneway suite or multiplex of up to 4 or 6 units
Four options for a Toronto residential lot. A lot can have a garden suite or a laneway suite, not both.

Small prefab homes and garden suites in Toronto

For most Toronto homeowners, the realistic prefab project isn’t a new house on an empty lot. It’s a small home in the backyard of the house they already own. Toronto calls this a garden suite. The rules were updated in 2025 (By-law 849-2025), and the City’s 2022 summary sheet is out of date.

Toronto’s garden suite rules (2026)

Toronto garden suite rules, 2026
RuleLimit
ZonesResidential zones R, RD, RS, RT and RM
SizeUp to 120 m² (about 1,292 sq ft) of gross floor area, or 60 m² (about 646 sq ft) if one storey. It must also be smaller than the main house
Height4.0 m if it sits less than 7.5 m from the house; 6.3 m if 7.5 m or more away. Two storeys maximum
Distance from the houseAt least 4.0 m, or 7.5 m for a suite taller than 4.0 m
Rear setback1.5 m
Side setbacksThe greater of 0.6 m or 10% of the lot frontage, up to 3.0 m. Where the wall has windows or doors, the greater of 1.5 m or 10%, up to 3.0 m
Emergency accessA path from the street at least 1.0 m wide with 2.1 m of headroom, and no more than 45 m of travel
Selling it separatelyNot allowed. A garden suite can’t be severed onto its own lot
Toronto garden suite rules 2026: up to 120 m² over two storeys, 4.0 or 6.3 m tall, at least 4.0 m from the house, 1.5 m rear setback
Toronto’s garden suite limits under By-law 849-2025. If a design doesn’t meet one, the Committee of Adjustment can approve a minor variance.

If a design doesn’t meet one of these rules, the Committee of Adjustment can approve a minor variance. That has to happen before the building permit.

Which of our designs fit

Judged by listed floor area against the one-storey limit of 60 m²:

  • Fox Den (505 sq ft, about 47 m²), Pine View (540 sq ft, about 50 m²) and Willow (564 sq ft, about 52 m²) are under the limit. Each starts at $229,500.
  • Kingswood and Bay Breeze (646 sq ft) sit right at the 60 m² line.
  • Modern Living is a two-storey design of 1,232 sq ft (about 114 m²), under the 120 m² two-storey limit.

The by-law measures gross floor area its own way, and height depends on where the suite sits on your lot. So we confirm the fit with the drawings and a lot plan before you commit.

Prefab garden suite designs against Toronto’s limits: Fox Den, Pine View and Willow under 60 m², Kingswood and Bay Breeze at 60 m², Modern Living under 120 m²
Five one-storey designs and one two-storey design, measured against Toronto’s 60 m² and 120 m² garden suite limits.

Laneway suites

A laneway suite needs a lot that touches a public lane for at least 3.5 m. It can be up to 10.0 m long and 8.0 m wide, with the same 4.0 m / 6.3 m height rule as a garden suite. If your lot backs onto a lane, we’ll check whether a laneway or garden suite suits it better.

What a garden suite costs beyond the home

City development charges:
none on a second, third or fourth unit. Toronto’s development charge by-law waives them, and provincial law exempts one unit in a backyard building. Where a charge would otherwise apply, the City also runs a 20-year deferral program for laneway and garden suites.
Parkland charge:
garden and laneway suites are exempt.
Building permit:
the City’s per-square-metre fee plus $56.33 for the new unit. A zoning review before you apply (the Zoning Applicable Law Certificate) costs $644.38. It’s optional, but it catches problems early.
School board charge:
a separate charge collected for the Toronto Catholic District School Board. Ask the City whether it applies to your suite.

For the rules on second units across Ontario, see our guide to additional dwelling units. For suite pricing, see our secondary suite prices.

Send us your lot survey and we’ll check which suites fit.

Prefab home prices in Toronto

Every Toronto prefab budget has two parts. The first is the price of the home. The second is everything your lot and the City add. Most budget surprises come from comparing one builder’s first number with another builder’s total.

The home

Starting prices by size range
Size rangeStarting priceExamples
505–788 sq ftfrom $229,500Fox Den, Pine View, Willow
988–1,418 sq ftfrom $289,500Orchard, Water’s Edge, Harbour Side
1,550–2,307 sq ftfrom $519,500Hudson, Lily of the Valley, Fern Gully
2,513–3,373 sq ftfrom $579,500Harbourside II, Muskoka, Victoria
  • What the starting price covers:

    the home built to spec. We build anywhere in Ontario, and delivery to your lot is confirmed after our first site visit.

  • What it excludes:

    foundation, site preparation, servicing connections and permits. These are quoted separately against your lot.

Price follows specification, not just size. Kingswood and Bay Breeze are both 646 sq ft but start at $259,500 and $299,500.

For larger homes, see our estate-size designs, up to 3,373 sq ft.

Prefab home prices from $229,500 to $579,500 across four designs, from the 505 sq ft Fox Den to the 3,008 sq ft Harbourside II
Starting prices from our catalogue, checked October 11, 2026. Foundation, site work, servicing and permits are quoted against your lot.

Toronto costs on top of the home (2026)

Toronto costs on top of the home, 2026
Item2026 amountNotes
City development charge, new single or semi-detached house$137,846Paid in full before occupancy (since November 3, 2025). A 60% cut is approved but waits on a provincial funding agreement, so budget the full amount until the City confirms it.
Education development charge (TCDSB)$3,893To December 2, 2026; $4,193 from December 3, 2026
Building permit, new house$18.56 per m² of floor area, plus $56.33 per new unitAbout $1,781 for a 1,000 sq ft (93 m²) house. Minimum fee $214.79
Zoning Applicable Law Certificate (optional pre-check)$644.38New house or garden/laneway suite
Street Occupation Permit for the craneDaily feesAbout 12 weeks to process. See the modular section below
TRCA property inquiry, if your lot may be regulated$385At least two weeks
Foundation, site preparation, servicing, demolitionQuoted against your lotWe price these after the site visit
Toronto development charges 2026: $137,846 for a new house versus $0 for a garden suite built as a second unit
City and school board charges, permit fees and lot costs for each. A 60% cut to the City charge is approved but waits on a provincial funding agreement.
  • Replacing an existing house: that’s exempt from Toronto’s parkland charge.
  • Vacant lot: ask the City whether a parkland payment applies before you budget.

Affordable prefab homes in Toronto

Prefab isn’t automatically the cheapest way to build in Toronto. Land, development charges and servicing cost the same whether the house is built in a factory or on site. What prefab does give you is a fixed price for the home and less time exposed to winter weather and site delays.

The most affordable routes in Toronto are usually:

  • A garden suite on a lot you already own.

    No land to buy, and no City development charge as a second unit.

  • One of our compact designs

    (505–788 sq ft, from $229,500), as a suite or a small home.

  • The new-home GST/HST rebates, if you qualify.

    See the financing section below.

Compare all 33 designs with floor plans and starting prices.

Prefab homes in North York and across Toronto

Part of the City of Toronto since January 1, 1998

  • North York
  • Scarborough
  • Etobicoke
  • York
  • East York

North York, Scarborough, Etobicoke, York and East York have all been part of the City of Toronto since January 1, 1998. Most properties follow Toronto’s city-wide Zoning By-law 569-2013. Some properties are still governed by a former municipal by-law, such as North York’s By-law 7625. The City’s interactive zoning map shows which one applies to yours.

What this means in practice:

Units:
North York lots can have up to four units. The six-unit permission applies only in Toronto and East York District and Ward 23.
Garden and laneway suites:
the same rules as everywhere in the city, set out above.
Variances:
if your design needs a variance, Toronto’s Committee of Adjustment decides it.
Toronto multiplex rules 2026: up to 3 units under Ontario law, 4 units city-wide including North York, and 6 in Toronto and East York District and Ward 23
North York lots can have up to four units. The six-unit permission applies only in Toronto and East York District and Ward 23.

If you’re comparing builders for a site-built custom home rather than prefab, see our Toronto custom home builders page.

Permits and approvals for a prefab home in Toronto

The building permit

A new house in Toronto needs a building permit from Toronto Building. The application includes:

  • a site plan with a zoning summary;
  • a lot grading plan;
  • SB-12 energy compliance forms;
  • a Tree Declaration Form;
  • a road damage deposit.

Plumbing, HVAC and drain permits are filed alongside it. A factory-built home goes through the same permit as a site-built one.

Under Toronto’s rules, most residential buildings with 10 units or fewer don’t need separate site plan approval. Lots near rail lines, river or stream valleys, wetlands or the lakeshore can still trigger it.

Conservation authority (TRCA)

If your lot is in or near a river or stream valley, the Lake Ontario shoreline or a wetland, building a new home may need a permit from the Toronto and Region Conservation Authority (TRCA).

Check first:
TRCA has an online map, but notes that not every regulated area is mapped. For a definite answer, TRCA’s property inquiry letter costs $385 and takes at least two weeks.
Coming change:
under Bill 97, TRCA and Central Lake Ontario Conservation Authority are set to merge into the Central Lake Ontario Regional Conservation Authority on February 1, 2027, or a later date set by regulation.

Ravine and tree protection

  • Ravine and natural feature protection areas:

    removing or harming any tree, regardless of size, or changing the grade of the land needs a City permit.

  • Anywhere else:

    a permit is needed to remove or injure a private tree 30 cm or more in diameter (measured 1.4 m above the ground), or a City street tree of any size.

Root zones and branches near the crane path count. That’s why the permit application asks for a Tree Declaration.

Toronto approvals checklist for a prefab home: zoning, TRCA, ravine and tree permits, building permit documents, crane permit and development charges
What to check before, during and after the building permit. The Street Occupation Permit for the crane takes about 12 weeks.

Not sure whether your lot needs a TRCA, ravine or tree permit?

Modular homes in Toronto: how they’re built and delivered

A modular home is built in finished sections in a factory, then set on a foundation on your lot by crane. While the sections are built, your foundation and servicing are prepared on site, so the two run in parallel.

Getting the home onto a Toronto lot

Many Toronto lots don’t have room for a crane on the property. The crane usually stands on the street and lifts the sections over the house or along the side yard.

Street Occupation Permit:
the City’s permit for “hoisting with mobile crane or boom truck”. Processing takes about 12 weeks once the City has everything it needs, so we apply early.
Road-disruption notice (RoDARS):
also required.
Daily fees:
charged for occupying the road, and higher where a lane is closed.

We plan the lift at the first site visit: crane position, overhead wires, trees and the route to the backyard for a garden suite.

Mobile crane on a residential street lifting a finished modular home section over a front yard
On many Toronto lots the crane works from the street, which needs a City Street Occupation Permit.

Tight side yard, overhead wires or a backyard suite? Send us your address and lot survey.

CSA A277 and the factory

Some of our models are CSA A277-certified. CSA A277 is the national certification for factory-built buildings, and it covers the work done in the factory, not transport or set-up on site. For factories certified to a CSA standard, the City of Toronto relies on that certification instead of sending its own inspectors to the factory. Ask us which models carry it.

Modular homes for sale in Toronto

Our 33 designs are preconfigured. Each has a fixed starting price and full floor plans, and each can be adjusted. You buy the home built for your lot, not a home sitting on a sales lot.

Energy performance of a prefab home in Toronto

Built for year-round living:
every one of our models is insulated and heated, and built to the Ontario Building Code.
Energy compliance:
every new house in Toronto has to show it with the SB-12 forms filed with the building permit. Prefab and site-built homes meet the same standard.
Factory building:
materials stay dry and the structure goes up indoors through the winter.

We don’t claim Passive House or LEED certification for our standard models. If those matter to you, raise them at the design stage.

Rebates: most energy rebates you’ll read about don’t apply to a new home.

Financing, rebates and warranty

Mortgages and construction financing

CMHC Prefab Plus (launched May 2026):

  • mortgage insurance for factory-built homes;
  • minimum down payment of 5% of the first $500,000 and 10% of the rest;
  • funds released in up to four draws as the build progresses;
  • purchase price under $1.5 million.

The home must be suitable and available for full-time, year-round occupancy, with year-round vehicle access. A Toronto house on a permanent foundation fits that.

Financing a garden suite:
since January 15, 2025, CMHC-insured refinancing has been available to add a self-contained secondary suite to your home, up to 90% loan-to-value on properties under $2 million. The federal government’s examples name basement suites and laneway homes, not garden suites, so confirm with your lender.
Not yet available:
the federal Secondary Suite Loan announced in 2024 is still listed as in development.

GST/HST new-home rebates

  • Federal first-time buyer rebate:

    up to 100% of the 5% GST, to a maximum of $50,000. It phases out between $1 million and $1.5 million. If we build on land you already own, construction must start on or after March 20, 2025 and before 2031.

  • Ontario Enhanced New Housing Rebate:

    up to $80,000 of the provincial part of HST, for a home valued under $1.85 million. For a home built on your own land, construction must start between April 1, 2026 and March 31, 2027.

These rebates have strict rules. Confirm yours with the CRA or a tax advisor before you count on them.

Rebates, financing and warranty depend on your land and your timing.

Tarion and HCRA

Anyone who builds new homes for others in Ontario must hold a licence from the Home Construction Regulatory Authority (HCRA), and the home must be enrolled with Tarion. Check any builder on HCRA’s Ontario Builder Directory before you sign.

When we build on land you own, Tarion treats it as a “contract home”:

Warranty:
  • 1 year for workmanship and Building Code issues;
  • 2 years for water penetration and the electrical, plumbing and heating systems;
  • 7 years for major structural defects.
Money paid before the home is finished:
up to $40,000 of financial-loss coverage. Deposit protection doesn’t apply to contract homes.
Enrolment:
the builder must enrol the home with Tarion before you sign the construction contract.
Tarion contract-home coverage: 1-, 2- and 7-year warranty, plus up to $40,000 of financial-loss coverage before the home is finished
When we build on land you own, Tarion treats it as a contract home. Check any builder on HCRA’s Ontario Builder Directory before you sign.

We’ll walk you through costs, permits and timing for your address.

More for Toronto

Frequently asked questions

Are prefab homes allowed in Toronto?

Yes. A factory-built home goes through the same zoning review and building permit as a site-built home. It has to meet the Ontario Building Code and Toronto’s zoning by-law.

How much does a prefab house cost in Toronto?

Our homes start at $229,500 for 505–564 sq ft designs. Lot costs come on top. For a new house, the largest is the City development charge of $137,846, plus a $3,893 school board charge, permit fees, the foundation and servicing.

Can I put a prefab garden suite in my backyard in Toronto?

In most residential zones, yes. A garden suite can be up to 120 m² over two storeys, or 60 m² on one storey. It must be smaller than your house and meet height, distance and access rules. It can’t be sold separately.

Do garden suites pay development charges in Toronto?

A garden suite built as your second unit pays no City development charge. A separate school board charge may apply, so ask the City.

How is a modular home delivered to a Toronto lot?

By truck, then lifted into place by crane, usually from the street. The crane needs a City Street Occupation Permit, which takes about 12 weeks to process.

Do I need a TRCA permit?

Only if your lot is in TRCA’s regulated area, which covers land in or near valleys, the lakeshore and wetlands. Check TRCA’s map, or request a property inquiry ($385, at least two weeks).

Can I get a mortgage on a prefab home in Toronto?

Yes. Lenders finance factory-built homes on permanent foundations. CMHC’s Prefab Plus insurance allows 5% down on the first $500,000 and up to four draws during the build.

Is a prefab home covered by Tarion?

Yes. A home we build on your land is a Tarion “contract home”: 1-, 2- and 7-year warranty coverage, plus up to $40,000 of financial-loss coverage before it’s finished.

Can I build a multiplex in Toronto?

Toronto allows up to four units on a residential lot city-wide, and up to six in Toronto and East York District and Ward 23. Our catalogue covers detached homes and backyard suites. Talk to us about your plans.

How we verified this page (October 11, 2026)

Primary sources checked for this page
FactSource
Garden suite rules: size, height, distance, setbacks, one suite type per lotToronto Zoning By-law 569-2013, Chapter 150.7 (as amended by By-law 849-2025)
Garden suites approved city-wide, no severanceCity of Toronto: Garden Suites
Garden suite emergency access pathCity of Toronto: New Garden Suite permit guide
Laneway suite rules: lane frontage, length, width, heightToronto Zoning By-law 569-2013, Chapter 150.8 (as amended by By-law 847-2025); City of Toronto: Laneway Suites
Four-unit and six-unit multiplex permissionsCity of Toronto: Multiplex Housing
Up to three units on urban residential landPlanning Act, s. 35.1(1)
Development charge exemption for a unit in a backyard buildingDevelopment Charges Act, 1997, s. 2(3.2) and (3.3)
City development charge rateCity of Toronto: DC By-laws & Rates and the rate sheet effective June 26, 2025
DC reduction awaiting a funding agreementCity of Toronto: Development Charges and Bill 1268 (60% reduction)
DCs paid before occupancyCity of Toronto: Non-Rental Residential Development Charges
No City DC on units 2–4; garden and laneway suites exempt from parklandBy-law 845-2025
Replacement house exempt from parklandBy-law 1144-2022
Garden and laneway suite DC deferralCity of Toronto: DC Deferral Program
Education development chargeCity of Toronto: Education Development Charges
Permit fees and zoning certificate feeCity of Toronto: Building Permit Fees
New house permit requirementsCity of Toronto: New House permit guide
North York part of Toronto since 1998City of Toronto Archives: former municipalities
Zoning By-law 569-2013 and former by-lawsCity of Toronto: Zoning By-law 569-2013
Committee of AdjustmentCity of Toronto: Committee of Adjustment
TRCA regulated areas and property inquiriesTRCA: Planning and Permits, Regulated Area Search and Property Inquiries
Conservation authority mergerBill 97, Plan to Protect Ontario Act (Budget Measures), 2026
Ravine and tree permitsCity of Toronto: When to apply for a tree or ravine permit
Street Occupation Permit for cranesCity of Toronto: Street Occupation Permit
City relies on CSA factory certificationCity of Toronto staff report, March 4, 2025
CSA A277 covers factory work, not transport or set-upStandards Council of Canada: CSA A277 notice
CMHC Prefab PlusCMHC: Prefab Plus and CMHC news release, May 2026
CMHC refinance for secondary suitesCMHC: Refinance and Department of Finance Canada, October 2024
Secondary Suite Loan statusHousing, Infrastructure and Communities Canada: programs
First-time buyer GST rebate (owner-built)CRA: First-Time Home Buyers’ GST/HST Rebate, who can apply and CRA tax tip
Ontario Enhanced New Housing RebateCRA: Ontario Enhanced New Housing Rebate
Greener Homes Grant and Loan closedNRCan: Canada Greener Homes Grant and Canada Greener Homes Loan
Home Efficiency Rebate Plus closedEnbridge Gas: Home Efficiency Rebate Plus
Home Renovation Savings Program and new buildsHome Renovation Savings Program: help and support
HCRA licensing and the Ontario Builder DirectoryHCRA: Do I need a licence? and Ontario Builder Directory
Tarion contract-home coverageTarion: Coverage before you close, Building & Selling Contract Homes and warranty coverage
Sean Stevenson, Chief Marketing Officer at My Own Cottage

Sean Stevenson

Chief Marketing Officer and Buyer Experience Lead, My Own Cottage Inc.

Sean Stevenson is Chief Marketing Officer and Buyer Experience Lead at My Own Cottage Inc., an HCRA-licensed, Tarion-enrolled prefab home and cottage builder based in Orillia, Ontario.

For five years, Sean has worked alongside the company’s build team, guiding Ontario buyers from lot assessment and budgeting beyond the model price through zoning, permits, development charges and final occupancy. Sean focuses on the part most buyers underestimate: what a prefab home costs to complete once the foundation, servicing and approvals are added to the model price.